Bath remodel: Week 1

Aug 14-18, 2000

The contractor will be here Monday morning, 8:00 AM, so Mitsuko and I remove everything we want to keep Sunday afternoon and evening. This is what the bathroom looked like when we were done.


ISO 0   f/2.6   1/60   0 ev   7.2mm


ISO 0   f/2.6   1/60   0 ev   7.2mm


ISO 0   f/2.6   1/60   0 ev   7.2mm


ISO 0   f/2.6   1/32   0 ev   7.2mm


ISO 0   f/2.6   1/60   0 ev   7.2mm


ISO 0   f/2.6   1/60   0 ev   7.2mm


After the first day of demolition the tub, toilet, wash basins, and cabinetry were gone. Some of the flooring has been removed, too.


ISO 0   f/2.6   1/109   0 ev   7.2mm


ISO 0   f/2.6   1/30   0 ev   7.2mm


ISO 0   f/3.0   1/30   0 ev   10.9mm


ISO 0   f/2.6   1/89   0 ev   7.2mm


ISO 0   f/2.6   1/56   0 ev   7.2mm


ISO 0   f/2.6   1/61   0 ev   7.2mm


The shower, flooring, and much of the wallboard went on the second day. There is no indication of water or moisture leaks around either the shower or tub areas.


ISO 0   f/2.6   1/61   0 ev   7.2mm


ISO 0   f/2.6   1/36   0 ev   7.2mm


ISO 0   f/2.6   1/30   0 ev   7.2mm


ISO 0   f/2.6   1/59   0 ev   7.2mm


ISO 0   f/2.6   1/30   0 ev   7.2mm


Final demolition: the room is ready for the plumber to come in and start making his plans. That will occur Friday – we’ll have a day off Thursday.


ISO 0   f/2.6   1/66   0 ev   7.2mm


ISO 0   f/2.6   1/49   0 ev   7.2mm


ISO 0   f/2.6   1/30   0 ev   7.2mm


 