Bath remodel: Week 10

Last updated (UTC) $Date: 2007/06/07 03:08:33 $

Oct 16-20, 2000

Insulation and wall board go up this week. The wet area held water without a leak from Friday until they drained in Wednesday. And speaking of leaks I fixed the leak in the downstairs bathroom -- it was a leaking wax seal under the toilet exacerbated by lots of silicon sealer around the bowl keeping the leak hidden until it worked its way under the tile to the wall.

shower area wash area tub area black paper over insulation soffit wall above toilet room/closet door toilet room entrance inside toilet room soffit by doorway


More wall board. All seems to be done save the odd size sections above the triangular soffit. The inspector was here and signed off on both the wallboard and the shower pan.

toilet room shower area shower ceiling triangular soffit soffit over entrance cabinet/mirror area oops: pocket door doesn't open all the way

The final bits of sheet-rock were done and we're now ready for the taper to come in next week and make it look pretty.

Above the soffit and closet door left side of soffit steam generater toilet window Toilet room


<<< [prev] | [next] >>> SNAFU.ORG HOME PAGE
Send comments $snafu: index.html,v 1.14 2007/06/07 03:08:33 marc Exp $