Bath remodel: Week 21
Last updated (UTC) $Date: 2007/06/07 03:08:34 $
Jan 1-5, 2001
About 5 more pieces of stone went up Wednesday, four of which
went in the shower area. The second picture on the left is
taken from about where the shower door will be, looking up toward
the ceiling. Looks quite nice.
The floor heating vent was moved in preparation for the cabinets.
The first picture below shows how sheet metal was used in the
cabinet base to redirect the air out from the moved vent. The
rest of the pictures show the cabinets going in. The knobs haven't
arrived yet. The cabinet top will be surfaced in Marble. Currently
the cabinet door will open over the top. I don't know if that will be
true after the stone is added.
The wiring comes through the back of the cabinet at the right side of
the right wall unit. The switches will be mounted in the cabinet
wall.
|