Bath remodel: Week 27

Feb 12-16, 2001

The bulk of the stone is just about done. There are two bits of floor, one for the tub and the other in the toilet, that need to be done as well as the facing on the soffit above the shower. Before the soffit facing can go up the support bar needs to be installed. The bar arrived Tuesday and should be installed Wednesday. A small radius has been ground into the stone at the mitered corners -- lots of dust.

ISO 0   f/2.6   1/45   0 ev   7.2mm
ISO 0   f/2.8   1/86   0 ev   8.6mm
ISO 0   f/3.4   1/55   0 ev   14.3mm
ISO 0   f/3.7   1/60   0 ev   17.6mm
ISO 0   f/2.6   1/30   0 ev   7.2mm
ISO 0   f/2.6   1/83   0 ev   7.2mm

The polished nickel support rod for the shower area is installed. It’s wrapped in a movers blanket to keep it from being damaged.

ISO 0   f/2.6   1/30   0 ev   7.2mm
ISO 0   f/2.6   1/60   0 ev   7.2mm
ISO 0   f/2.6   1/51   0 ev   7.2mm