Bath remodel: Week 4

<=== Prev Next ===>


Sep 4-8, 2000

Even though Monday was Labor Day, there will still a few guys working on the framing for a short while. The small window was removed, and the top of the shower enclosure is beginning to take shape.


ISO 0   f/4.7   1/138   0 ev   8.4mm


ISO 0   f/2.6   1/114   0 ev   7.2mm


ISO 0   f/2.6   1/30   0 ev   7.2mm


The plumbers came back to add the drains. Framing continues with the tops of the toiler room and shower enclosure.


ISO 0   f/3.1   1/30   0 ev   11.5mm


ISO 0   f/3.6   1/60   0 ev   16.0mm


ISO 0   f/3.5   1/60   0 ev   15.3mm


ISO 0   f/2.8   1/30   0 ev   8.6mm


More framing. They tried to run a tape under the 2nd story floor from the roof to the bathroom to pull the cable for the steam generator power. No luck. It’s my guess that the pipes, vents, and heating ducts are getting in the way.


ISO 0   f/2.9   1/60   0 ev   9.7mm


ISO 0   f/2.6   1/60   0 ev   7.2mm


ISO 0   f/2.7   1/60   0 ev   8.0mm


ISO 0   f/3.4   1/60   0 ev   14.9mm


Power for the steam generator was run under the rear porch. Conduit will go across the roof from the junction box to the service panel. Some more framing has been done.


ISO 0   f/4.0   1/60   0 ev   20.4mm


ISO 0   f/2.6   1/60   0 ev   7.2mm


ISO 0   f/2.6   1/30   0 ev   7.5mm


ISO 0   f/3.4   1/60   0 ev   14.7mm


 

<=== Prev Next ===>



validate