Bath remodel: Week 4

Last updated (UTC) $Date: 2007/06/07 03:08:36 $

Sep 4-8, 2000

Even though Monday was Labor Day, there will still a few guys working on the framing for a short while. The small window was removed, and the top of the shower enclosure is beginning to take shape.

Bye-bye window (outside) Bye-bye window (inside) shower framing


The plumbers came back to add the drains. Framing continues with the tops of the toiler room and shower enclosure.

toilet enclosure Drains Drain below tub shower ceiling detail more shower enclosure


More framing. They tried to run a tape under the 2nd story floor from the roof to the bathroom to pull the cable for the steam generator power. No luck. It's my guess that the pipes, vents, and heating ducts are getting in the way.

shower enclosure entry way wiring existing security system wiring the electician's outlet


Power for the steam generator was run under the rear porch. Conduit will go across the roof from the junction box to the service panel. Some more framing has been done.

new wiring start of soffit above counters where lighting will go power for steam generator