More deconstruction (August 6)

The deck over the east balcony is lifted to evaluate the condition of the roof extension and the flashing.

East balcony, stair side East balcony, roof side

The medicine chest/light was removed to protect it while removing the glass brick. The glass brick came out without having to shatter the individual bricks. The only concern is if the mortar will come off the side of the tub without damaging the finish. Worst case: the tub can be refinished.

fixtures removed top bricks removed more bricks removed brick/marble tile removed tub detail

As expected, dry rot was found under the deck of the west balcony.

balcony deck frame dry rot more dry rot