Home Improvements, 2003 [page 11]

New decks (August 18-22)

The deck at the west side of the master bedroom was finished by Wednesday. The redwood looks so good we're thinking stain instead of paint.

fascia and posts decking rails finished deck

Now that the front (west) balcony is done work is starting on the rear. First the siding is properly flashed around the overhang, then the frame for the deck is built.

north side of east balcony south side of east balcony flashing detail flashing below balcony fascia, east balcony ready for deck

The stringer is rotted at the bottom step. The step was removed and will be replaced next week. The deck and top step are done. The rails, gate to the roof, and a few cracked steps will be replaced next week. That and a bit of trim is about all that is needed on the exterior of the house.

deck and posts broken bottom step top step and deck

<=== Prev Next ===>

$snafu: index.html,v 1.12 2007/06/07 22:34:10 marc Exp $ validate