At 7 AM this morning the crew started laying the black paper weed barrier. That was followed by barrow after barrow of bed gravel to a depth of 3 inches plus. The plus is where extra gravel was added to flatten the area with a slight pitch away from the house for drainage. A mechanized tamper was used to pack everything down.

The area surrounding the pathway stones got less gravel. Once the stones were layed in their approximate positions a layer of sand was added under and around the stones. The depth of stone plus sand plus gravel matches the depth of the gravel in the turf only areas.

A large and very heavy roll of the artifical turf was manhandled into the back yard. A smaller roll went to the side yard. Both were trimmed to very rough shape. Tomorrow a smaller crew will start positioning the turf.

Weed barrier

Weed barrier

Weed barrier
Gravel

Gravel

Gravel
Load those barrows

Load those barrows

Load those barrows
Pathway

Pathway

Pathway
Gravel replaced by sand

Gravel replaced by sand

Gravel replaced by sand
Side yard rough cut

Side yard rough cut

Side yard rough cut
Pull!

Pull!

Pull!
Pull, again

Pull, again

Pull, again
Back yard rough cut

Back yard rough cut

Back yard rough cut

 

<=== Prev Next ===>