Bath remodel: Week 41

May 21-25, 2001

Trim, new sliding doors, and prep work this week. The installation of new sliding doors has nothing to do with the bathroom remodel, it just happened to occur this week. For the remodel most of the trim between wall and ceiling was installed. The prep work is putting lacquer sanding sealer on the cladding and oil/stain on the wood that will make up the trellis that hides the external plumbing. The external plumbing was also painted to match the house color.

ISO 0   f/2.9   1/44   0 ev   9.8mm
ISO 0   f/3.9   1/60   0 ev   18.8mm
ISO 0   f/5.3   1/84   0 ev   11.9mm